Cyprus building permit fees could start at €3 per square metre of covered space for new homes under proposals from the Ministry of the Interior. Shops and offices would pay €5 per square metre, while tourism developments would pay €6.

The draft regulations, approved by the Council of Ministers and submitted to Parliament, would replace the current fee schedule with a simpler system based on how a building is used. They would also introduce an 80% refund for applicants who withdraw in writing within 20 days of submitting their application.

How much would a Cyprus building permit cost?

The proposed rates apply to covered space, with an additional charge for uncovered space in some categories.

Type of development Proposed fee per m² of covered space Additional fee per m² of uncovered space
Residential buildings €3 —
Commercial developments and offices €5 —
Industrial premises, workshops and warehouses €5 €1
Tourism developments €6 —
Health and social care facilities €6 —
Education facilities €5 —
Leisure, entertainment and cultural facilities €5 —
Sports facilities €5 €1

At the proposed residential rate, a home with 150 square metres of covered space would carry a €450 building permit fee. The figures cover the fees charged by the issuing authority. Construction costs and professional fees are separate.

The draft retains the fee exemption for specified works at buildings used for public worship and at schools. Private schools are excluded from the exemption.

The same calculation wherever you build

The proposals would scrap the three geographical charging bands, so the same calculation would apply regardless of where a project is located. For most developments, applicants would multiply the relevant area by the rate for that type of project.

The draft would also remove the current sliding scale for new buildings, additions, changes of use and the subdivision of buildings into separate units. A similar change is proposed for the division of land into plots.

The Cyprus Scientific and Technical Chamber (ETEK) recommended the reform. In its explanatory report, the ministry says the simpler calculation should make charges easier for applicants, design professionals and authorities to check. It also aims to speed up processing.

When could applicants get 80% back?

Applicants would pay the fee when they submit their application. The draft makes the timing explicit and requires the authority to refund the difference if it collects too much.

Anyone who withdraws an application in writing within 20 days of submitting it would get 80% of the fee back. The authority would keep the remaining 20%. The draft provides no general right to a refund for withdrawals after that deadline.

Fewer separate charges for outdoor works

Boundary walls, fencing, uncovered terraces, parking areas and landscaping for yards or gardens would carry no separate fee when they form part of the main development. Some outdoor works would still attract their own fee if the authority considers them as standalone developments.

For alterations, additions and changes of use, the fee would be based on the area affected, with a minimum charge of €100. Structural or energy-efficiency upgrades would be charged at half the applicable rate.

What about solar farms, plot divisions and renewals?

The draft also sets out fees for energy projects, infrastructure and other permit applications.

Project or permit Proposed fee
Solar farms €0.40 per m² of installation area
Wind farms 1% of the estimated value of the building works
Mobile phone antennas €250
Substations, biological treatment plants, pumping stations and desalination facilities €8 per m², with a €100 minimum
Land subdivision €0.20 per m² of the resulting plots or public open space, with a €200 minimum
Subdivision of a building into separate units €30 per unit
Opening or building a road €0.50 per linear metre, with a €50 minimum
Demolition permit €50
Permit renewal €50

For projects outside the listed categories, the Minister of the Interior could issue circulars or guidelines on how to calculate the fee. The calculation would have to reflect the cost of the service provided.

When would the new permit fees take effect?

The proposed Cyprus building permit fees can take effect once the approval process is complete and the regulations are published. The draft also includes transitional provisions for permits that have already been approved and cases where fees have already been paid.

Further reading

Unofficial British English translation of the draft building permit fees.

Translated and adapted from an article published by StockWatch

subscribe

RELATED ARTICLES

PLEASE LEAVE A COMMENT

  • All comments are vetted. Please keep all comments on-topic and relevant to the substance of the original article and ensure that the email address you provide is accurate and verifiable.
  • Comments considered to be potentially libellous and those containing racist, vulgar, derogatory, discriminatory or offensive language, personal attacks or advertising will be rejected.
  • Comments must not harass, abuse, or threaten another's personal safety or property, make false statements, defame, or impersonate someone else.
  • Do not submit the same comment more than once or it may be rejected.
  • Comments only please. If you have a question, visit the on-line Cyprus property forum.
  • Comments failing to comply with these guidelines will not be published.

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Essential Cyprus Property News
delivered once a week

Market analysis - Prices · Sales · Legal matters

Free. Unsubscribe anytime.

We handle your data responsibly, find more about our privacy policy

Due Diligence

Due diligence is absolutely essential before committing to buy a property.

Top Stories

Property Transfer Fees

Property transfer fees are paid to secure the Title Deed & legal ownership of a property.

EUR - Euro Member Countries
GBP
1.1966
RUB
0.0109
CNY
0.1355
CHF
1.0815

Capital Gains Tax

CGT applies to property sales and share disposals in companies holding property.

Elsewhere in Cyprus Property News